1. Inspect your shipment for damage before taking delivery
  2. Pipe the compressor with Soft connections out of the compressor and in and out of the dryer – 1 to 2 foot soft connection minimum.
  3. Compressor discharge Line must slope down to the next component. If it doesn’t you will need a water trap at the discharge.
  4. Install a line reactor before the compressor and have the electrician check all electrical connection to make sure they didn’t loosen up during shipping.
  5. Connect the compressor to our app on your smart phone before you start it (connection guide)

Make sure your voltages are between 215-230 Volts single Phase, 208-230 Volts 3 Phase, 460-505 Volts 3 Phase, or 560-615 Volts 3 Phase. Voltages must not be less than min values anytime when compressor running

Review installation guides for more detail

Last modified: 6 February 2025

Feedback

Was this helpful?

Yes No
You indicated this topic was not helpful to you ...
Could you please leave a comment telling us why? Thank you!
Thanks for your feedback.

Post your comment on this topic.

Post Comment